Beginning January 6th, the main entrance will be closed (except for access to the 24-hour space) for construction. Visitors should use the entrance on the east side of the building near Hildreth-Mirza Hall and follow signs for services on the first floor. Library circulation services (checking out materials, including holds and interlibrary loan items) will take place during this time in the Research Services consultation area on the first floor. Some services may be disrupted or unavailable while construction is underway.
Between January 6th and the completion of construction, returned materials may be dropped off inside the library near the temporary side entrance.